Bathroom Tile Installation in Palm Coast, FL
We install bathroom tile in Palm Coast on floors, walls, tub surrounds and showers, with a waterproofing membrane in every wet area. Our own crew does the tear-out, the waterproofing and the tile. Most shower retiles take 3 to 5 days, and the work carries a 5-year warranty.
- Floors
- Walls
- Tub surrounds
- Showers, niches and benches
The bathroom tile we install in Palm Coast homes
Palm Coast Tile & Stone installs tile in every part of a bathroom that takes water or foot traffic. The company is fully insured and has no subcontractors, so the tile setter who measures your bathroom is the one who tiles it.

Bathroom floor tile
Porcelain, ceramic and natural stone floors in a hall bath or a primary suite. We measure the room first, then settle slip rating, tile size and grout color with you before a single cut. In a wet room, grip comes before color. Floors in the rest of the house go through our floor tile installation.

Bathroom wall tile
Full-height walls, wainscot and vanity walls. Before large wall tile goes up we check the wall with a straightedge, because a bowed stud shows through as uneven edges at every joint once light hits the wall from the side.
Tub surrounds and tub decks
Tile around a tub, carried to the ceiling or the window, and tiled decks on drop-in tubs. We caulk the inside corners and the tub edge instead of grouting them. That joint moves with the house. Rigid grout can't.
Shower tile
Walls and floors for walk-in showers and tub-to-shower changes, all set over a waterproofing membrane. We check the slope to the drain before any tile goes down, then tile the niches and benches along with the walls.

Mosaic and accent tile
Penny, hex and pebble mosaics, accent bands and stacked feature walls. We recommend mosaic for most shower floors, since the small pieces follow the slope to the drain and the extra grout lines add grip underfoot.
Grout and caulk joints
Grout color, sealing and the movement joints that keep tile from cracking. We seal grout where the material calls for it and put flexible caulk wherever tile meets a tub or an inside corner. Worn joints in an older bathroom get our grout and hollow tile repair.

19+
Years of Experience
- Why hire us
Why Palm Coast homeowners hire us for bathroom tile
Our owner, Jeff Herbert, is a journeyman tile setter, so you deal with the same person at the estimate, on the job and at the final walkthrough. The business has been family-owned since 2007, which makes 19 years of tile in Palm Coast homes. One name, start to finish.
"We really appreciated how careful he was with the details, especially making sure everything was lined up properly."
Ivy B., Google review of a tile floor installation
No subcontractors
Our own crew handles every bathroom we take on.
Fully insured
Coverage is in place on every job, large or small.
Free estimates
We measure the room and price it at no cost.
Tile and plumbing together
On a tub-to-shower job, one crew does the valve, the drain and the tile.
Bathroom tile jobs we have finished
We tiled every shower, tub surround and floor below on our own jobs. More are in our recent tile projects.

Marble-look walk-in shower
Large marble-look porcelain with a corner bench and a mosaic floor.

Stacked accent wall
A gray vertical stack on the back wall, a recessed niche and a hex mosaic floor.

Sage subway shower
Sage green glass subway tile under a glass block window.

Plank-look shower
Gray plank-look wall tile with a double niche.

Marble and mosaic
White marble-look walls over a tan mosaic floor.

Subway tub surround
White subway tile around a tub, carried up to the window.

Shower and vanity wall
Marble-look tile across the shower, the bench and the vanity wall.

Glossy subway shower
Dark glossy subway tile over a white band, with a fold-down seat.
What our customers say about the work
Palm Coast homeowners review our tile work on Google in their own words.
What goes under our bathroom tile, and what Florida code requires
We install a waterproofing membrane under tile in every wet area. Grout isn't waterproof. The FBC and the Florida Plumbing Code put numbers on most of the other layers, and the table shows what each one protects.
| Layer | What the code or standard says | What it protects |
|---|---|---|
| Liner test | Florida Plumbing Code 312.9 (2023) fills the plugged shower liner to 2 inches at the threshold for 15 minutes with no leakage | A leak found before tile goes on costs a patch, not the tile |
| Wall backer | FBC R702.4.2 lists allowed backers such as cement board, and R702.3.7 bars water-resistant drywall where water hits directly | Drywall softens and the tile loosens |
| Shower floor slope | FBC P2709.1 sets 1/4 to 1/2 inch per foot toward the drain | Water leaves the floor instead of standing on it |
| Mortar coverage | The Ceramic Tile Education Foundation calls for 95 percent in wet areas and 80 percent in dry areas | Voids sound hollow and crack where the load lands |
| Floor flatness | ANSI A108.02 allows 1/8 inch of dip in 10 feet under tile with an edge of 15 inches or longer | Large tile bridges a dip and cracks over it |
We recommend asking every installer which membrane goes in and how long the pan is tested. Fifteen minutes is the code minimum, not a ceiling.
The tile we recommend for Florida bathroom floors and walls
Palm Coast Tile & Stone recommends porcelain for most bathroom floors, since it absorbs 0.5 percent water or less and shrugs off Florida humidity. Sealed natural stone suits walls and dry areas.
| Tile | Water absorption | Best use | Watch-out |
|---|---|---|---|
| Porcelain | 0.5 percent or less | Floors, shower walls and floors | Large sizes need a flat floor |
| Ceramic | Above 0.5 percent | Walls and dry areas | Check the floor rating before using it underfoot |
| Natural stone | Varies by stone | Walls and dry floors | Needs a sealer, and marble can etch |
| Mosaic (penny, hex, pebble) | Depends on the material | Shower floors | More grout lines to clean |
Under ANSI A137.1 and A326.3, a level interior floor walked on while wet should test at a wet DCOF (a slip-resistance rating) of 0.42 or higher. Palm Coast skews older, with 29.5 percent of residents 65 or over (U.S. Census Bureau, ACS), so we check the slip rating before tile color. Large tile can work in a small bathroom too. We check the floor with a straightedge first. It has to be flat.
Showers, niches and benches we tile
Shower tile goes over a waterproofing membrane on the walls and the floor. Under it, the FBC requires a floor sloped 1/4 to 1/2 inch per foot toward the drain (P2709.1).
On a conversion, our crew handles the job from the old tub to the finished shower. Nobody waits on another trade.

1/4 in
Minimum shower floor slope per foot
How we run a bathroom tile job from estimate to walkthrough
A bathroom tile job runs in eight steps. The same tile setter is on site from the first measurement to the last.
1. Free estimate
We come out, measure the areas to be tiled and talk through your style and budget.
2. Tile and grout choice
You pick tile, grout color and trim with his help, and we confirm the slip rating for any floor.
3. Tear-out
The old tile comes out. Then we check the surface under it for dips and damage.
4. Backer and floor repair
We repair a damaged backer or a dip in the floor before anything is set.
5. Waterproofing
We install the membrane in every wet area, walls and floor.
6. Layout and setting
We check the layout line first, so cuts land at the edges and not across the middle of the room.
7. Grout, seal and caulk
Grout goes in once the mortar has cured. Then we seal where the material calls for it and caulk the corners and the tub edge.
8. Walkthrough
We walk the finished room with you. Ask us anything.
How long a bathroom tile job takes
Most bathroom jobs finish inside two weeks once work starts. Tear-out, backer work and cure time take more of the schedule than setting the tile does. Tile goes fast.
You get the schedule for your own bathroom in writing at the free estimate.

1 to 2
Weeks for a full bathroom
Permits, insurance and warranty before we start
Settle three things before the first tile comes up, whether the job needs a City of Palm Coast permit, who carries the insurance and what the warranty covers.
Permits
The City of Palm Coast issues permits through its Building Division. The FBC requires one (section 105.1) before anyone alters or repairs a building or replaces plumbing. A tile-only job can land on either side of that line, so call (386) 986-3780 before you sign.
Insurance
Palm Coast Tile & Stone carries insurance on every job, large or small. Our crew handles the work, with no subcontractors, so the coverage named on the estimate covers the people working in your bathroom.
Warranty
Palm Coast Tile & Stone warrants every bathroom it tiles for five years on workmanship. If tile, grout or a shower we set fails in that time because of how we installed it, we repair it at no charge.
Signs we look for in Palm Coast bathrooms built in the 2000s
About 42.5 percent of Palm Coast homes were built between 2000 and 2009, with a median build year of 2003 (U.S. Census Bureau, ACS 2020-2024). In those homes, the original bathroom tile is now 17 to 26 years old. It shows. When we walk one of these bathrooms, we check for six signs first.
We fix a few cracked or hollow tiles as a tile repair. A soft spot, a stain that keeps coming back or a floor that moves means the layers under the tile have failed, and the room needs new tile.

2003
Median build year in Palm Coast
Where we set bathroom tile
Palm Coast Tile & Stone installs bathroom tile in Palm Coast and the towns around it, from Beverly Beach on the coast down to Daytona Beach and up to Jacksonville. Tap your town for local details, or see all our service areas.
Palm Coast, FL
Where we're based. We work in every part of the city, from Palm Harbor and Belle Terre to Seminole Woods, Lehigh Woods and Grand Haven.
Bathroom tile questions

How much does bathroom tile installation cost in Palm Coast?
Bathroom tile runs $8 to $22 per square foot installed, and the size of the room, the tile you pick, how much old tile and backer has to come out and whether the shower is part of the job set where yours lands. A shower costs more than a floor. The membrane and the slope work take time. We price your bathroom at a free estimate, and the written quote lists demolition, backer repair, waterproofing, tile and setting materials, sealing and any permit as separate lines. Call (386) 393-1166 to book it, or read what moves the tile installation cost in Palm Coast for other rooms.
Why do bathroom tile estimates for the same room differ so much?
Two quotes rarely cover the same job. One prices demolition, backer repair, a membrane and trim, and another prices only setting tile over what's there. Compare the lines, not the totals, and ask what happens if the crew finds damage behind the old tile.
How long does it take to tile a bathroom?
Once we start, a bathroom floor takes 2 to 3 days, a shower retile 3 to 5 days and a full bathroom 1 to 2 weeks. Tearing out old tile adds time. So does cure time, because thinset and grout must set before the shower gets wet.
Can you tile over my existing bathroom tile?
On a dry floor, sometimes. It works if every tile is bonded, flat and clean and the extra height clears the door and the toilet flange. In a shower or tub surround the old tile comes off, because the membrane belongs on the backer and not on tile. We check the bond and the height during the estimate.
What is the best tile for a bathroom floor in Florida?
Porcelain is the usual pick for a Florida bathroom floor. Look for a wet DCOF of 0.42 or higher, and consider a mosaic on a shower floor, where the grout lines add grip. Large tile can work in a small bathroom, but the floor under it must be flat.
Do I need a permit to retile a bathroom in Palm Coast?
A permit is required when work alters or repairs a building or replaces plumbing, under Florida's building code, and a tile-only job can fall on either side of that line. The Building Division at (386) 986-3780 tells you which before the work starts.
Do you handle a tub-to-shower conversion?
Yes. We take the conversion from the old tub to the finished shower, valve and drain included, so you deal with one crew from start to finish. A walk-in shower in a tub's footprint changes the floor, the walls and the water lines at once, and one crew keeps that schedule simple.
Can I hire a tile setter directly instead of a general contractor?
You can. We take tile jobs directly. The tile setter who gives your estimate stays on the job through the final walkthrough. For other trades in a larger project, such as cabinets or glass, you'll line up those crews yourself or through your general contractor.
Get a free bathroom tile estimate
Family-owned since 2007. Fully insured. Free estimates.
Call (386) 393-1166 or send the form, and we'll reply the same day. We book estimates Monday through Saturday, 7:00 AM to 7:00 PM.

















